Winter Term Classroom and Cluster Updates
During the Winter Term, IT was busy updating classrooms and renovating the Union and Library Clusters.
See below for information about the completed work.
Building | Room | Description |
IMRC | 113 | All New 27″ iMacs w/ Retina 5K displays, 6th Gen. core-i7 CPU’s, 16GB RAM, 1TB Fusion Drives |
Shibles | 202 | Installed Apple TV |
DPC | 105 | HDMI connection, Apple TV, a button controller, and new speakers will be installed on 1/21/17. |
DPC | 109 | Extron controller, HDMI connection |
Little | 219 | Extron controller, HDMI connection |
Union Cluster | 1st Floor Union | The number of workstations in the cluster was reduced to make room for the Hackerspace that will occupy one end of the cluster space.
The equipment in the cluster was replaced with 2 new 27″ iMAC Retina 5K computers, 10 new HP Windows Desktops with Dual Displays (one 21.5″ and one 17″ ), and 2 New Canon Copiers (one 35ppm Color / one 35ppm B&W ). |
Fogler Information Commons (formerly CML) | 1st Floor, Fogler Library |
Furniture has been updated to match the remainder of the Library’s Information Commons.
10 new HP Windows Desktops with Dual Displays ( one 21.5″ and one 17″ ) will be added once electrical work is finished. 2 New Canon Copiers (one 35ppm Color / two 35ppm B&W).
|